112 - Calving Building
Calving buildings are normally found on large dairy operations where they can separate the cows into an individual building during the calving time. Typically this building has a 14' base story height with curtain side walls and a steel roof.
Included
- Concrete Slab Floor
- Electrical/Lighting
- Fiberglass Facing Ceiling Finish
- Partitions
- Plumbing Hookups
Note: Partitions and ceiling finishes have been added to account for a small office or storage area.
Not Included
- Equipment Costs (example: Pens, gates, slatted floors, auto watering and feeding systems)
| Yes | No |